Overview
Project Summary Sheni’s Auto Trend was a complex retrofit of a defectively built automotive facility with unsafe wiring, framing, and services. Beyond correcting code and life-safety issues during construction, the client asked for a clear-span shop with no interior columns—all while holding to the original budget. The Azimuth Builders team and trades developed creative structural and phasing solutions, transforming the space from a dirt-stained grease garage into a code-compliant, high-end dealership and service shop.
Scope Highlights
• Full code remediation (electrical, structural, mechanical, and life safety)
• Clear-span structural solution to eliminate interior columns in the shop
• Reconfiguration and modernization of 6,500 ft² office/showroom
• Cost-savvy value engineering to maintain the original budget
• Phased construction to keep operations moving where possible
"I felt comfortable and had piece of mind that Azimuth Builders were handling the construction of my first owned building. They gave me ways on how to save money when my ideas were just to extravagant. I was satisfied that Azimuth Builders was in charge of the construction and would recommend them any time."
- Sheni Janmohamed